For solar installers

Solar permits with PE coordination built in.

Dallas needs a PE stamp on every system. Fort Worth needs one over 10kW. We coordinate the engineer, build the packet, and file through Accela so your install crew doesn't sit idle.

  • $699 flat per permit (PE included)
  • Avg. file time: 3–5 days
  • Single-line, structural, attachment plan
The packet

Every plan set, every calc, every stamp.

What's in the AI packet

  • Single-line electrical diagram
  • String sizing & voltage drop calcs
  • Attachment plan with rafter spec
  • Structural load analysis
  • Module + inverter cut sheets
  • Roof plan with array layout + setbacks

Where the PE stamp sits

  • Dallas: required on every solar system, regardless of size.
  • Fort Worth: required on systems >10kW (Accela portal).
  • Tarrant County: stamp coordinated when residential exceeds load thresholds.
  • We work with a network of Texas-licensed PEs — coordination is included in the $699 flat fee.
Workflow

From design to filed permit.

1

Send the design

Aurora export, PVsyst report, or our intake form. Whatever your team produces.

2

AI builds the packet

Single-line, attachment plan, structural calcs, cut sheets. PE-ready format.

3

PE stamps where required

We coordinate the licensed engineer in our network. Stamp returned in 1–2 days.

4

Filed via Accela

Human reviewer signs off, submits through Accela, you get the application number.

Stop chasing permits

Hand your next permit to four AI agents.

3–5 business days. Flat fee. Free for your first three during beta.