Solar · Dallas

Solar permits in Dallas.

PE stamp required on every solar system, regardless of size. We coordinate the engineer and submit the full packet through Accela.

  • Flat fee: $699
  • Avg. turnaround: 3–5 business days (PE coordination included).
Jurisdiction rules

What we file in Dallas.

  • PE stamp required on every system, regardless of size.
  • Single-line diagram, structural calcs, attachment plan.
  • Filed through Accela citizen portal.
  • Module + inverter cut sheets attached.
  • Inspection coordination after approval.
Workflow

How a Dallas permit moves through PermitsDone.

1

Drop the job

Address, scope, photos. We classify the jurisdiction and pre-empt rejections.

2

AI drafts the packet

The right form, the right attachments, encoded for Dallas.

3

Pre-flight + review

40-point checklist, then a licensed permit tech signs off.

4

Filed via the portal

Submitted through Accela Citizen Access (Dallas). Application number in your inbox.

Stop chasing permits

Hand your next permit to four AI agents.

3–5 business days. Flat fee. Free for your first three during beta.