Harv
Triage & coordinator
Reads every new job and every alert, then pings whichever specialist should handle it.
Roofing and solar contractors in Dallas–Fort Worth hand us the job. A team of seven AI agents drafts the packet, files it with the city, and watches every step — with a human in the loop on the things that matter. Most permits land in 3 to 5 business days. Flat fee. No subscription.
Filing across DFW jurisdictions
Seven agents run PermitsDone. Each one has a job, a personality, and a slack-style feed where they hand off work to each other. You can watch them work — in real time — from the moment you upload a job.
Triage & coordinator
Reads every new job and every alert, then pings whichever specialist should handle it.
Runs the actual pipeline
Intake → packet → preflight → file with Tarrant / Dallas / Fort Worth → chase the AHJ.
Last check before the city sees it
Reviews every packet for missing fields, suspicious values, weak scope, and AHJ-specific rules. Blocks bad filings before they're rejected.
Watches the whole stack
Every few minutes, scans the pipeline, Stripe, and the filing worker. Diagnoses failures and escalates if it can't self-heal.
Reconciles every charge
Watches Stripe, refunds, and pricing health. Totals revenue and unit economics in real time.
Talks to your customer
Drafts plain-English status updates whenever something moves. No corporate boilerplate.
City rules · always current
Reads ordinance updates and re-verifies fee schedules so the pre-flight checklist matches what each city wants today.
Most contractors lose 6–12 hours per permit chasing forms, calling planners, and resubmitting after rejections. We replaced that with software that knows the rules and a human who knows the city.
Every jurisdiction has its own quirks. We picked roofing and solar in DFW so we could memorize every checklist, every inspector's pet peeve, and every form revision.
Tarrant County, Fort Worth, Dallas, Arlington, Plano, Frisco. We know which cities require crickets over 30", drip edge spec, decking replacement triggers, and 115-mph wind loads.
Dallas, Fort Worth, Plano, Arlington. We coordinate the PE stamp where required (Dallas: all systems; Fort Worth: >10 kW), upload through Accela, and chase inspections.
Flat-fee per filing. Unlimited revisions if the city requests changes. No subscriptions, no setup fees.
Single-family roof permits across DFW jurisdictions.
Rooftop solar, including PE stamp coordination where required.
10+ permits a month? We'll quote a volume discount and assign a dedicated permit tech.
Pay only when your permit is filed. No subscription, no setup fee, no minimums.
We carry Errors & Omissions coverage. Our terms cap our liability at fees paid — we don't take on your project risk.
TLS in transit. AES-256 at rest. Files and customer info are never shared with third parties or used to train models.
If we don't file your packet within five business days of receiving everything we need, you don't pay for that permit.
We started PermitsDone after watching a friend's roofing crew sit idle for three weeks waiting on a Tarrant County permit that came back twice for the same fixable issue. The AI doesn't get tired of reading checklists. We don't either.