Solar · DFW overview

Solar overview permits in Dallas–Fort Worth.

Solar permit rules across the DFW metro at a glance. Dallas, Fort Worth, and Tarrant County each have a different bar.

  • Flat fee: $699
  • Avg. turnaround: 3–5 business days.
Jurisdiction rules

What we file in Dallas–Fort Worth.

  • Dallas: PE stamp on every system, no exceptions.
  • Fort Worth: PE stamp on systems >10kW, Accela portal.
  • Tarrant County: stamp coordinated when residential exceeds load thresholds.
  • Single-line, attachment plan, structural calcs included for all jurisdictions.
  • Module + inverter cut sheets, roof layout with setbacks, attached on every packet.
Workflow

How a Dallas–Fort Worth permit moves through PermitsDone.

1

Drop the job

Address, scope, photos. We classify the jurisdiction and pre-empt rejections.

2

AI drafts the packet

The right form, the right attachments, encoded for Dallas–Fort Worth.

3

Pre-flight + review

40-point checklist, then a licensed permit tech signs off.

4

Filed via the portal

Submitted through Accela (Dallas + Fort Worth) / county direct (Tarrant). Application number in your inbox.

Stop chasing permits

Hand your next permit to four AI agents.

3–5 business days. Flat fee. Free for your first three during beta.