Solar · Fort Worth

Solar permits in Fort Worth.

Solar PE stamp required for systems over 10kW. We coordinate the engineer, build the packet, and submit through Accela.

  • Flat fee: $699
  • Avg. turnaround: 3–5 business days (PE turnaround included).
Jurisdiction rules

What we file in Fort Worth.

  • PE stamp required on systems >10kW.
  • Single-line diagram, attachment plan, structural calcs included.
  • Filed through Accela citizen portal.
  • Module & inverter cut sheets attached.
  • Inspection coordination after approval.
Workflow

How a Fort Worth permit moves through PermitsDone.

1

Drop the job

Address, scope, photos. We classify the jurisdiction and pre-empt rejections.

2

AI drafts the packet

The right form, the right attachments, encoded for Fort Worth.

3

Pre-flight + review

40-point checklist, then a licensed permit tech signs off.

4

Filed via the portal

Submitted through Accela Citizen Access (Fort Worth). Application number in your inbox.

Stop chasing permits

Hand your next permit to four AI agents.

3–5 business days. Flat fee. Free for your first three during beta.